Browsing New Zealand Society for Earthquake Engineering by Title
Now showing items 1082-1101 of 1863
-
Performance of Seismically Isolated High-Speed Railway Bridges against Near-Fault Ground Motions
(2024-04-09)The first high-speed rail (HSR) corridor in India, built on viaducts and bridge structures, is currently under construction between Mumbai and Ahmedabad. This corridor passes through seismic Zone III, whereas future corridors ... -
Performance of Taranaki Volcanic Silts under Cyclic Loading
(2021-04-14)WSP has been involved in a number of building projects in New Plymouth. Some of the buildings are founded on volcanic silts (Taranaki ash). Field and simplified laboratory tests often indicate that these materials are ... -
Performance-based Assessment and Seismic Strengthening of the Christ Church Cathedral
(2024-04-09)The Christ Church Cathedral is a significant landmark for New Zealand. It was severely damaged in the 2011 Canterbury earthquakes – the Tower and Rose Window/western façade of the Cathedral suffered partial collapses while ... -
Performing Structural Assessment using Acoustic Measurements
(2023-04-19)Natural hazards, such as earthquakes, could be catastrophic. One challenge that society faces is how to provide a rapid and accurate evaluation of the structural damages after the events. Traditional visual inspection is ... -
Philosophical reflexions following the Lyttleton 2011 New Zealand Earthquake: Ten years after
(2021-04-14)At 12:51 p. m. on 22 February 2011, the Mw 6.3 Lyttelton earthquake struck the Canterbury region of New Zealand. The seismic event was reported as the result of the rupture of a previously unknown geological fault, 5.9 km ... -
Pitfalls in the estimation of seismic hazard
(1982-06-30) -
Planning for disaster
(1989-12-31) -
Plastic hinge locations in steel columns
(2010-03-31) -
Police action
(1969-03-31) -
Post-disaster building functionality: preliminary findings of a systematic review
(2023-04-19)During a natural hazard event, buildings are likely to experience some sort of damage, thus limiting their ability to function as intended. The severity of the ensuing consequences for various stakeholders and the community ... -
Post-earthquake building assessments: How long do they take?
(2023-06-01) -
Post-earthquake Building Safety Evaluation Training, Palu, Indonesia
(2021-04-14)Palu City and other parts of Central Sulawesi were severely impacted by a MW 7.5 earthquake and tsunamis on 28 September 2018 as a result of a rupture of the Palu–Koro Fault. The earthquake resulted in 4,400 deaths and ...