• Login
    View Item 
    •   NZSEE Document Repository
    • New Zealand Society for Earthquake Engineering
    • Bulletin of the New Zealand Society for Earthquake Engineering
    • View Item
    •   NZSEE Document Repository
    • New Zealand Society for Earthquake Engineering
    • Bulletin of the New Zealand Society for Earthquake Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Financial risk assessment methodology for natural hazards

    Thumbnail
    Date
    2006-06-30
    Authors
    Dhakal, Rajesh P.
    Mander, John B.
    Metadata
    Show full item record
    Abstract
    Engineered facilities are deemed safe if they have little or no probability of incurring damage when subjected to regular actions or natural hazards. Any probability of the performance of any designed system (i.e. capacity) not being able to meet the performance required of it (i.e. demand) results in risk, which might be expressed either as a likelihood of damage or potential financial loss. Engineers are used to dealing with the former (i.e. damage), which gives a fair indication of repair/strengthening work needed to bring the system back to full functionality. Nevertheless, other non-technical stakeholders (such as owners, insurers, decision-makers) of the designed facilities cannot read too much from damage. Hence, risk, if interpreted in terms of damage only, will not be comprehended by all stakeholders. On the other hand, financial risk expressed in terms of probable dollar loss in easily understood by all. Therefore, there is an impetus on developing methodologies which correlate the system capacity and demand to financial risk. This paper builds on the existing probabilistic risk assessment methodology and extends it to estimate expected annual financial loss. The general methodology formulated in this paper is applicable to any engineered facilities and any natural hazard. To clarify the process, the proposed methodology is applied to assess overall financial risk of a highway bridge pier due to seismic hazard.
    URI
    https://doi.org/10.5459/bnzsee.39.2.91-105
    Published in
    • Bulletin of the New Zealand Society for Earthquake Engineering

    Contact Us | Send Feedback
     

     

    Browse

    Entire RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    Contact Us | Send Feedback