• Login
    View Item 
    •   NZSEE Document Repository
    • New Zealand Society for Earthquake Engineering
    • Bulletin of the New Zealand Society for Earthquake Engineering
    • View Item
    •   NZSEE Document Repository
    • New Zealand Society for Earthquake Engineering
    • Bulletin of the New Zealand Society for Earthquake Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Anglican Parish of Blenheim: strengthening to the Church of the Nativity

    Thumbnail
    Date
    1983-03-31
    Author
    Davidson, C. C.
    Metadata
    Show full item record
    Abstract
    The Church of the Nativity in
Blenheim is in two distinct structural types. The nave, narthex and tower are
of brick veneered reinforced concrete
and steel portal frames constructed
about 1959 to replace an old timber building. Check calculations showed this to generally meet latest code requirements. The transept and chancel was, prior to the strengthening work, of unreinforced brick masonry built about 1906 - with some reinforced buttresses and reinforced concrete bands. The whole building is roofed with concrete tiles. The initial assessment of the building was made in terms of Clause 301A of the Municipal Corporation Act in 1976. This building is regarded as one of Blenheim's finest older buildings and the members of the Church did not wish to lose, or detract from, its character, either by obvious strengthening or rebuilding.
    URI
    https://doi.org/10.5459/bnzsee.16.1.64-68
    Published in
    • Bulletin of the New Zealand Society for Earthquake Engineering

    Contact Us | Send Feedback
     

     

    Browse

    Entire RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    Contact Us | Send Feedback