Show simple item record

dc.creatorMayes, R. L.
dc.creatorMostaghel, N. M.
dc.creatorClough, R. W.
dc.creatorDickey, W. L.
dc.date1974-09-30
dc.identifierhttps://bulletin.nzsee.org.nz/index.php/bnzsee/article/view/1229
dc.identifier10.5459/bnzsee.7.3.105-114
dc.descriptionThe paper describes the preliminary phase of an experimental investigation into the behaviour of reinforced masonry shear wall elements subjected to high speed cyclic loading. The three specimens tested in the preliminary phase were full scale wall panels about 4 meters square, each consisting of two piers connected by a top and bottom spandrel; each panel was made from a different material. The results of the tests on the three specimens are presented in the form of dynamic force deflection relationships. The test equipment designed for the program is described in detail, and the next phase of the test program is outlined.en-US
dc.formatapplication/pdf
dc.languageeng
dc.publisherNew Zealand Society for Earthquake Engineeringen-US
dc.relationhttps://bulletin.nzsee.org.nz/index.php/bnzsee/article/view/1229/1193
dc.rightsCopyright (c) 1974 R. L. Mayes, N. M. Mostaghel, R. W. Clough, W. L. Dickeyen-US
dc.rightshttps://creativecommons.org/licenses/by/4.0en-US
dc.sourceBulletin of the New Zealand Society for Earthquake Engineering; Vol 7 No 3 (1974); 105-114en-US
dc.source2324-1543
dc.source1174-9857
dc.titleCyclic 
tests
 on
 masonry piers
en-US
dc.typeinfo:eu-repo/semantics/article
dc.typeinfo:eu-repo/semantics/publishedVersion
dc.typeArticleen-US


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record