• Login
    View Item 
    •   NZSEE Document Repository
    • New Zealand Society for Earthquake Engineering
    • Bulletin of the New Zealand Society for Earthquake Engineering
    • View Item
    •   NZSEE Document Repository
    • New Zealand Society for Earthquake Engineering
    • Bulletin of the New Zealand Society for Earthquake Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    A review of post-earthquake building control policies with respect to the recovery of the Christchurch CBD

    Thumbnail
    Date
    2012-09-30
    Authors
    Galloway, B.D.
    Hare, H.J.
    Metadata
    Show full item record
    Abstract
    The Canterbury earthquake sequence was particularly disruptive for building owners and businesses located within the CBD. The initial damage to buildings in the relatively moderate September 2010 earthquake was surpassed by the significantly more damaging February 2011 event, challenging the way in which engineers have traditionally considered earthquake recovery. Internationally, re-occupation of buildings following an earthquake has been based on the need to get businesses operating from buildings that are rapidly identified as having suffered minor structural damage. However, following the February 2011 earthquake, the shift in risk profile was reflected by limiting re-occupation unless it could be shown that the building also had a minimum capacity to resist earthquakes. This challenges the balance between continuing function and safety in the traditional post-earthquake evaluation process. The timeframe for commencement of repairs has a significant impact on the speed of recovery. The importance of well defined regulations was highlighted in the well insured Christchurch building market, where legal arguments halted repairs in many instances. There is also a clear need for a modified, streamlined building consent process for the repair of earthquake damaged buildings. This paper looks at the various building control policies enacted during the Canterbury earthquakes, and their effectiveness in aiding the recovery of the Christchurch CBD.
    URI
    https://doi.org/10.5459/bnzsee.45.3.105-116
    Published in
    • Bulletin of the New Zealand Society for Earthquake Engineering

    Contact Us | Send Feedback
     

     

    Browse

    Entire RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    Contact Us | Send Feedback