• Login
    View Item 
    •   NZSEE Document Repository
    • New Zealand Society for Earthquake Engineering
    • Bulletin of the New Zealand Society for Earthquake Engineering
    • View Item
    •   NZSEE Document Repository
    • New Zealand Society for Earthquake Engineering
    • Bulletin of the New Zealand Society for Earthquake Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Accelerated Bridge Construction (ABC) and seismic damage resistant technology

    Thumbnail
    Date
    2012-09-30
    Authors
    Palermo, Alessandro
    Mashal, Mustafa
    Metadata
    Show full item record
    Abstract
    Although New Zealand bridges performed well structurally during recent Canterbury earthquakes, some critical arterial routes lost their functionality. Life Safety is still our primary objective but nowadays we are moving towards new societal needs which also, at minimum, aim to limit business disruption. Building designers are already moving towards low-damage system technology for both structural and non-structural components. Bridge engineers have to inherit those enhanced concepts and technologies. In fact, in order to protect the economy and save lives, it is vital that bridges remain drivable after a natural disaster, such as an earthquake. More importantly asset managers and networks’ owners want rapid response, design flexibility, quick construction and limited maintenance costs. This should be possible to be achieved by contractors and designers with limited budgets. In very populated urban centres or a critical network location and moderate-to-high seismicity an Accelerated Bridge Construction (ABC) technology which combines durable materials and low-damage technology, seems to be the only viable solution to minimize traffic disruption during the bridge life. The American Association of State Highway Transportation Officials (AASHTO) started in 2002 a long-term strategic bridge plan which aims to cover all these issues. Similar research strategy was initiated in Japan, Taiwan and Europe which is slowly going towards adaptation of ABC as a standard bridge practice. The question would be what is New Zealand vision for the next twenty-thirty years? This paper aims to overview the current international trends and challenges and gives innovative concepts which can be contextualized for New Zealand bridges.
    URI
    https://doi.org/10.5459/bnzsee.45.3.123-134
    Published in
    • Bulletin of the New Zealand Society for Earthquake Engineering

    Contact Us | Send Feedback
     

     

    Browse

    Entire RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    Contact Us | Send Feedback