Show simple item record

dc.creatorDellow, G.
dc.creatorYetton, M.
dc.creatorMassey, C.
dc.creatorArchibald, G.
dc.creatorBarrell, D.J.A.
dc.creatorBell, D.
dc.creatorBruce, Z.
dc.creatorCampbell, A.
dc.creatorDavies, T.
dc.creatorDe Pascale, G.
dc.creatorEaston, M.
dc.creatorForsyth, P.J.
dc.creatorGibbons, C.
dc.creatorGlassey, P.
dc.creatorGrant, H.
dc.creatorGreen, R.
dc.creatorHancox, G.
dc.creatorJongens, R.
dc.creatorKingsbury, P.
dc.creatorKupec, J.
dc.creatorMacfarlane, D.
dc.creatorMcDowell, B.
dc.creatorMcKelvey, B.
dc.creatorMcCahon, I.
dc.creatorMcPherson, I.
dc.creatorMolloy, J.
dc.creatorMuirson, J.
dc.creatorO’Halloran, M.
dc.creatorPerrin, N.
dc.creatorPrice, C.
dc.creatorRead, S.
dc.creatorTraylen, N.
dc.creatorVan Dissen, R.
dc.creatorVilleneuve, M.
dc.creatorWalsh, I.
dc.date2011-12-31
dc.identifierhttps://bulletin.nzsee.org.nz/index.php/bnzsee/article/view/219
dc.identifier10.5459/bnzsee.44.4.227-238
dc.descriptionAt 12.51 pm (NZST) on 22 February 2011 a shallow, magnitude MW 6.2 earthquake with an epicentre located just south of Christchurch, New Zealand, caused widespread devastation including building collapse, liquefaction and landslides. Throughout the Port Hills of Banks Peninsula on the southern fringes of Christchurch landslide and ground damage caused by the earthquake included rock-fall (both cliff collapse and boulder roll), incipient loess landslides, and retaining wall and fill failures. Four deaths from rock-fall occurred during the mainshock and one during an aftershock later in the afternoon of the 22nd. Hundreds of houses were damaged by rock-falls and landslide-induced ground cracking. Four distinct landslide or ground failure types have been recognised. Firstly, rocks fell from lava outcrops on the Port Hills and rolled and bounced over hundreds of metres damaging houses located on lower slopes and on valley floors. Secondly, over-steepened present-day and former sea-cliffs collapsed catastrophically. Houses were damaged by tension cracks on the slopes above the cliff faces and by debris inundation at the toe of the slopes. Thirdly, incipient movement of landslides in loess, ranging from a few millimetres up to 0.35 metres, occurred at several locations. Again houses were damaged by extension fissuring at the head of these features and compressional movement at the toe. The fourth mode of failure observed was retaining wall and fill failures, including shaking-induced settlement and fill displacement. These failures commonly affected both houses and roads. In the days and weeks immediately following the earthquake a major concern was how to manage the risks from another large aftershock or a long return period rainstorm, in the areas worst affected by landslides, should one occur. Each of the four identified landslide types required a different risk management strategy. The rock-fall and boulder roll hazard was managed by identifying buildings at risk and enforcing mandatory evacuation. In the days immediately following the earthquake this process was based on expert opinion. In the weeks after the earthquake this process was rapidly enhanced with empirical data to confirm the risk. The rock-falls associated with cliff collapse were managed by evacuating properties damaged by extensional ground cracking at the top of the cliffs, adjacent properties, and properties damaged by debris inundation at the toe of the cliffs. The incipient landslide hazard was managed by rapidly deploying movement monitoring technologies to determine if these features were still moving and to monitor their response to on-going aftershock activity. The fill and retaining wall failures were managed by encouraging public reporting of areas of concern for rapid assessment by a geotechnical professional. The success of the landslide risk management strategy was demonstrated by the magnitude MW 6.0 earthquake of 13 June when rock-falls and boulder roll damaged evacuated buildings and ground cracking and debris inundation further damaged evacuated areas. Some incipient landslides reactivated, producing similar movement patterns to the 22 February 2011 earthquake. Several retaining walls identified as dangerous and cordoned off also collapsed. No lives were lost and no serious injuries were reported from landslides in the 13 June 2011 earthquake.en-US
dc.formatapplication/pdf
dc.languageeng
dc.publisherNew Zealand Society for Earthquake Engineeringen-US
dc.relationhttps://bulletin.nzsee.org.nz/index.php/bnzsee/article/view/219/206
dc.rightsCopyright (c) 2011 G. Dellow, M. Yetton, C. Massey, G. Archibald, D.J.A. Barrell, D. Bell, Z. Bruce, A. Campbell, T. Davies, G. De Pascale, M. Easton, P.J. Forsyth, C. Gibbons, P. Glassey, H. Grant, R. Green, G. Hancox, R. Jongens, P. Kingsbury, J. Kupec, D. Macfarlane, B. McDowell, B. McKelvey, I. McCahon, I. McPherson, J. Molloy, J. Muirson, M. O’Halloran, N. Perrin, C. Price, S. Read, N. Traylen, R. Van Dissen, M. Villeneuve, I. Walshen-US
dc.sourceBulletin of the New Zealand Society for Earthquake Engineering; Vol. 44 No. 4 (2011): Special Issue on the 2011 Christchurch Earthquake; 227-238en-US
dc.source2324-1543
dc.source1174-9857
dc.titleLandslides caused by the 22 February 2011 Christchurch earthquake and management of landslide risk in the immediate aftermathen-US
dc.typeinfo:eu-repo/semantics/article
dc.typeinfo:eu-repo/semantics/publishedVersion
dc.typeArticleen-US


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record