Now showing items 1-3 of 3

    • Seismic strengthening of the Seatoun Tunnel 

      Wymer, Paul; Latham, Dean; Radosavljevic, Bojan; Brabhaharan, Pathmanathan; Tawfeek, Faiz (2022-04-27)
      The Seatoun tunnel is a 147m long, vehicle and pedestrian tunnel built in 1906-1907 to provide a tram connection between the suburb of Seatoun the city of Wellington.  In 2011, the Seatoun tunnel structure was assessed as ...
    • Sustainability in enhancing the resilience of major route in Wellington 

      Arumugam, Sivasith; Brabhaharan, Pathmanathan (2022-04-27)
      Uncertainty in the seismicity of Wellington and climate change were key issues that influenced the design of strengthening of a key arterial route in Wellington. The abstract describes the innovations and technology adopted ...
    • Wellington region land transport resilience business case 

      Brabhaharan, Pathmanathan; Siazon, Michael (2022-04-27)
      The high seismicity, rugged terrain and an increasingly adverse climate exacerbated by climate change mean that the capital city Wellington’s transport system has severe deficiencies in its resilience to natural and ...