• Login
    View Item 
    •   NZSEE Document Repository
    • New Zealand Society for Earthquake Engineering
    • Proceedings of the 2024 New Zealand Society for Earthquake Engineering Annual Technical Conference
    • View Item
    •   NZSEE Document Repository
    • New Zealand Society for Earthquake Engineering
    • Proceedings of the 2024 New Zealand Society for Earthquake Engineering Annual Technical Conference
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Bridging engineering and social perspectives of post-earthquake functional recovery of commercial buildings

    Thumbnail
    Download
    PDF (447.5Kb)
    Date
    2024-04-09
    Authors
    Nkrumah, Sally
    Filippova, Olga
    Ying, Fei
    Metadata
    Show full item record
    Abstract
    The emerging post-earthquake functional recovery concept is gaining momentum among building professionals and policymakers. It highlights the importance of incorporating recovery-oriented objectives into building codes, moving beyond the conventional emphasis solely on safety objectives. The current body of literature predominantly focuses on functional recovery from an engineering perspective, with limited consideration of users’ viewpoints such as owners and tenants. Thus, the emphasis of this qualitative study is to bridge engineering and socioeconomic aspects for a holistic post-earthquake functional recovery concept. Differences in perceptions of building functionality exist between engineers and building users. Engineers tend to prioritise technical aspects, while users focus on the social context of functionality. Building users are directly involved in the daily operations of a building, as well as in coping and adjusting until full recovery post-earthquake. Recognising the inherent interconnection between social and technical perspectives, the socio-technical system (STS) theory was adopted to formulate a building-system functionality framework. Preliminary findings revealed that building users are primarily focused on their investments, business continuity, the return to buildings within reasonable timeframes and prioritising essential building services for continuous use following an earthquake. These insights help engineers in facilitating recovery processes. The mobilisation time framework for functional recovery has typically focused on the building-level recovery trajectory. This study advances the framework by incorporating socioeconomic parameters that account for user-level recovery trajectory. The significance of the study underscores that, beyond expert perspectives, actively engaging and involving building users and comprehending their recovery process, will foster trust and confidence in the functional recovery concept.
    URI
    https://repo.nzsee.org.nz/handle/nzsee/2766
    Published in
    • Proceedings of the 2024 New Zealand Society for Earthquake Engineering Annual Technical Conference

    Contact Us | Send Feedback
     

     

    Browse

    Entire RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    Contact Us | Send Feedback